Home/Glossary/Grand Inga
    Infrastructure

    Grand Inga

    A proposed hydroelectric dam on the Congo River with a potential capacity of 40,000 MW — the world's largest hydropower project.

    Definition & Context

    Grand Inga is a proposed mega-hydroelectric project on the Congo River near the existing Inga I and Inga II dams in Kongo Central Province. With a potential installed capacity of 40,000 MW (40 GW), Grand Inga would be the largest hydropower facility in the world — more than double the capacity of China's Three Gorges Dam. The project has been discussed for decades and would be developed in phases, starting with Inga III (11,000 MW). Grand Inga could supply electricity to the DRC, neighboring countries, and potentially export power as far as Southern Africa and even Southern Europe. However, the project faces enormous financing challenges (estimated $80 billion+), environmental concerns, and complex geopolitical negotiations.

    Key Facts

    • Potential capacity: 40,000 MW (40 GW)
    • Location: Congo River, Kongo Central Province
    • Would be the world's largest hydropower facility
    • Phase 1 (Inga III): 11,000 MW
    • Estimated cost: $80 billion+
    • Could supply electricity across Africa and beyond
    • Existing dams: Inga I (351 MW) and Inga II (1,424 MW)

    Global Context

    The Congo River has the second-largest flow rate of any river in the world and the largest untapped hydropower potential. Grand Inga represents a transformative infrastructure opportunity but requires unprecedented international cooperation and financing. The project could fundamentally alter Africa's energy landscape.

    Frequently Asked Questions

    What is Grand Inga?

    Grand Inga is a proposed hydroelectric mega-project on the Congo River with potential capacity of 40,000 MW. If completed, it would be the world's largest hydropower facility, surpassing China's Three Gorges Dam.

    When will Grand Inga be built?

    Grand Inga has been in planning for decades. The first phase (Inga III at 11,000 MW) has been the focus of negotiations, but financing and geopolitical challenges continue to delay the timeline. No firm construction start date has been set.